電氣自動化自我評價(jià)范文(精選3篇)
電氣自動化自我評價(jià)范文 篇1
大學(xué)畢業(yè)是我人生由校園步向社會的重大轉(zhuǎn)折點(diǎn),回顧大學(xué)四年,在老師的辛勤指導(dǎo)下,通過我認(rèn)真刻苦學(xué)習(xí),對本專業(yè)已經(jīng)有了全面深入的理解,掌握了豐富的機(jī)械設(shè)計(jì)制造及其自動化的理論知識和相關(guān)的實(shí)際操作技能。堅(jiān)信學(xué)海無涯的我在學(xué)習(xí)生活中不斷自我總結(jié),改善學(xué)習(xí)方法,端正學(xué)習(xí)態(tài)度.
在思想上,本人有著遠(yuǎn)大的理想,有良好的思想道德修養(yǎng),有堅(jiān)定的政治方向。熱愛祖國,熱愛人民,熱愛和平,熱烈擁護(hù)中國共產(chǎn)黨的領(lǐng)導(dǎo),自覺遵守法紀(jì)和各項(xiàng)規(guī)章制度,愛護(hù)公共財(cái)物,注重環(huán)保,尊敬師長,團(tuán)結(jié)同學(xué),樂于助人。
學(xué)習(xí)上,本人勤奮好學(xué),通過十多年的學(xué)習(xí)經(jīng)歷,積累了大量的學(xué)習(xí)經(jīng)驗(yàn),探索出一套適合自身發(fā)展情況的高效的學(xué)習(xí)方法。在學(xué)好專業(yè)課程的同時,我也注重對其它知識的了解和探究,選修了校內(nèi)的部分公選課,還學(xué)習(xí)了一些專業(yè)軟件的應(yīng)用,如autocad、pro/e、solidworks、caxa和office等。
曾擔(dān)任寢室長的我,對工作認(rèn)真負(fù)責(zé),一絲不茍。本著學(xué)以致用,提高動手能力的目的,我積極參加各種社會實(shí)踐活動,曾多次利用暑假的`空閑時間,到過機(jī)械廠和鉛銅廠從事雜務(wù)工作,深入社會、了解社會、廣泛接觸群眾、聯(lián)系群眾,從中樹立正確的勞動觀,培養(yǎng)團(tuán)隊(duì)協(xié)作精神。
在生活上,我有廣泛的興趣愛好,十分熱愛各種體育運(yùn)動,尤其是籃球和足球,對學(xué)校和班集體的活動都熱情參與。作風(fēng)嚴(yán)謹(jǐn)?shù)奈遥B(yǎng)成了良好的生活習(xí)慣,時間觀念強(qiáng)。本人性格溫和、謙虛,待人誠懇,平易近人,與人相處融洽。
立足現(xiàn)在,展望未來,由于本人的社會資歷尚淺,需以求真務(wù)實(shí)的態(tài)度,勇于拼搏的精神,去迎接新的挑戰(zhàn)。
電氣自動化自我評價(jià)范文 篇2
四年緊張而充實(shí)的大學(xué)生活,豐富了我,也磨礪了我。回憶四年的歷程,就要離開學(xué)習(xí)和生活過的地方,而迎面而來的將是社會的鍛煉,于是更加的懷念這個緊張而有序的大學(xué)生活,它給我留下了很多美好回憶,我孜孜不倦,勇于挑戰(zhàn)自我,充實(shí)自己。
在學(xué)習(xí)上:我廣泛涉獵了《物理》,《機(jī)械制圖》,《計(jì)算機(jī)應(yīng)用基礎(chǔ)》,《C語言》,《電工基礎(chǔ)》,《模擬電子技術(shù)基礎(chǔ)》,《數(shù)字電子技術(shù)基礎(chǔ)》,《工廠電氣設(shè)備控制》,《電力及電機(jī)拖動》等方面的電氣工程及自動化知識,先后參加學(xué)院組織的《工程概預(yù)算》,《電子商務(wù)概論》,《電氣故障查找》,《設(shè)備改造技術(shù)》,《市場經(jīng)濟(jì)》等各類選修課,并把理論知識應(yīng)用于實(shí)際操作中取得了國家技能鑒定的特種作業(yè)操作證,高級電工證。
除了學(xué)習(xí)主修課之外,還利用課余時間專修計(jì)算機(jī),使我能熟悉各種網(wǎng)絡(luò)和辦公軟件。曾獲過二等獎,除了在專業(yè)知識方面得到好的成績,平時我還涉獵了很多網(wǎng)絡(luò)編程,網(wǎng)絡(luò)管理與維護(hù),網(wǎng)頁設(shè)計(jì)等知識。
有句俗話是這樣說的:不謀全局者,不足以謀一時。所以我不斷地尋找機(jī)會鍛煉自己,領(lǐng)導(dǎo)者的能力是能觀察入微的。進(jìn)入學(xué)生會,我是從低做起的,當(dāng)時很不甘心,可現(xiàn)在回想起來,卻是十分感激那時的經(jīng)驗(yàn)。在低處做起,一步一步往上爬,而成為干部,感覺就像在自己的生命中添上了精彩的一幕,成為了另一種無形的力量在鼓勵我,讓我在修養(yǎng)方面能夠品德優(yōu)良、正直誠懇;在性格方面為人謙虛有親和力,能有很好處理人際交際的能力。
在工作方面能踏實(shí),任勞任怨,責(zé)任心強(qiáng),具有良好的組織交際能力,配合部長出色的完成了校團(tuán)委的宣傳活動和內(nèi)部的各項(xiàng)宣傳活動。我結(jié)合自身的特長,曾在校團(tuán)委舉辦的手工制作大賽中獲獎。由于工作積極努力,成績突出,被評為校“優(yōu)秀共青團(tuán)員”,得到老師和同學(xué)們的一致好評。無論工作多累,多繁瑣,都不再是一種疲憊,而是一種滿足和快樂。
在充滿科學(xué),人文氣息的大學(xué),我滿懷信心和熱情地度過了我人生中有重大意義的四年。通過四年的學(xué)習(xí)和生活,我思想變得更加開放,上進(jìn)和務(wù)實(shí),對知識的追求更加渴望。誠信為本,以德立身是我的做人原則;工作生活中積極進(jìn)取,嚴(yán)格要求自己,努力塑造完美充實(shí)的自我。
大學(xué)不但教會了我知識,讓我懂得為人處事的方式,更磨練了我堅(jiān)強(qiáng)的意志和必勝的信心。在這即將揮手告別美好的大學(xué)生活,踏上社會旅途的時候,我將以飽滿的熱情,堅(jiān)定的信心,高度的責(zé)任感去迎接新的挑戰(zhàn),跨越新的高峰。
電氣自動化自我評價(jià)范文 篇3
This year is coming to an end, in order to be able to work better in the next year, sum up experience, adhere to the advantages and correct deficiencies, according to company requirements, summarized as follows: in a year's work, through the summary, although made some progress, A lot of shortcomings and deficiencies. As an electrical and mechanical workshop electrical technicians, in the production of work is only constantly sum up the lessons learned and found that in order to make their own faster progress.
First, in-depth, solid work
As an electrical technician in the electromechanical workshop of the coal preparation plant, my main responsibility is to be responsible for the management of electrical technology in the electromechanical workshop, to work out the maintenance arrangement of the electrical equipment and the corresponding management rules and technical operation measures, organize the staff to do well in the business training; Often in-depth site, continue to promote new technology and new technologies.
Over the past year, I have been working hard, fulfilling my duties seriously, constantly improving myself from the technical and management level, and have made great achievements in all aspects. I work in the workshop with the same below the master of the workers, equipment problems encountered actively to the scene to deal with failures, eliminate hidden dangers. Insist on the scene every day to check the operation of equipment, high and low voltage equipment for power supply and distribution; master production process of coal preparation to learn the principle of centralized control; understand the control signal routing layout, information transmission. Now many aspects have made great progress, for example: the communication 2 station system, the elevator running system, automatic control system concentrator, filter closed-loop control system, King configuration system, pressurized filter system, the main Plant and new plant coal washing system, from shallow to deep grasp the basic control structure and principle of the system. So I have a very thorough understanding of the production process of coal washing, and have learned the knowledge and the actual production of effective combination for the future to better theory with practice, better promote the production, better reduce the workers The master of the labor intensity, more effective to improve labor productivity, for enterprises and the community to create more benefits laid a solid foundation. Other aspects of meticulous improvement and completion of electrical safety regulations and measures to seriously monitor the implementation of the annual maintenance in the 11, through the replacement and overhaul of the transformer, but also learned a lot of things usually do not see, so I coal washing Plant electrical equipment with a deeper understanding.
Material plan to provide timely, comprehensive, accurate spare parts parameters is the guarantee of normal operation of the equipment, I am responsible for the electrical equipment materials plan to report work, at work, I ran the scene, check the problem, so that spare parts can be more comprehensive and reliable , To avoid the lack of spare parts and delay the status of production. And through the low-voltage power distribution room to find the problem, and other technical staff together proposed the transformation of low-voltage distribution room equipment plan, and through the production of selection, use, the basic solution to the production of spare parts for the purchase of passive, and Resulting in equipment failure problems. Low voltage power distribution room of the new plant are used in the domestic production of electrical components, AC contactor with the use of materials often aging, poor access to auxiliary early, the signal is not normal and so on, after the decision to use imported Siemens contactor to transform it, So far, basically solved the problem caused by the contactor accident occurred, reducing the accident rate, a substantial increase in the driving rate, to ensure the normal production of coal washing.
In the work, the first is strict on their own, do not allow the staff to do, their firm quit, for the field workers to set an example. In the implementation of the implementation of procedural measures, the strict on-site, the work of a number of measures do not quit. The illegal behavior of workers and non-standard behavior resolutely stop. In the production of security incidents and accidents affecting the production of serious organizational analysis, do not go through the motions, accountability does not take the form, so that the implementation of responsibility, education, alert everyone's purpose. The second is to consider the work of small, so that the overall balance, that is, there are safety education and specific work arrangements, taking into account the production and taking into account the electrical and mechanical and business, so that the face of all non-leakage control, the work done a layout, , There are checks. Third, pragmatic, through the daily study, and constantly improve their theoretical level, operational level, practical experience and personal qualities. Fourth, a solid work, the work does not remain on the surface, not afraid of difficulties, not afraid of wounding, truth-seeking results, and further improve their management level.
Second, join the technical innovation, never in innovation
In the work, seriously to the old comrades to learn, and constantly improve themselves, and use other time, learn more new knowledge. And actively participate in the plant plc program control system to the transformation, and achieved certain results, including the following: First, seriously involved in the flotation automation system, and basically mastered the flotation automatic control system, mastered the The new control system, learned to solve and deal with problems in ways and methods; followed by the thickener automatic control system transformation, the OMRON plc with updated understanding; Third, the design of the plant ash measurement system configuration screen Designed to make better use of gray instrument in the production, to make the configuration screen, you can use the unit time of the various instantaneous ash, the unit time to calculate the average ash to solve the ash analyzer average ash value The design and transformation of the chain of 302 chain-link protection procedures, and in the configuration screen to add 302 chain-link chain protection alarm, reducing the chain once the parking chain will be mistaken for a broken chain protector Motion problems, and solve the previous chain protection device action, the alarm can also start the car issue, reducing the electrician to determine the fault and solve the problem of processing time; Fifth, add the belt belt ash tester fault alarm device, the use of Ash measured ash content of the actual value, compared with the set percentage, when the ash over 12.00ash, that is audible and visual alarm (now only the optical signal, not the use of sound alarm), the other is now on the ash measuring instrument Adjustments are being made to meet actual production requirements. So that the driver in accordance with the production needs of the timely adjustment of ash to avoid excessive ash caused unnecessary losses.
Third, shortcomings and shortcomings
As the time to the coal preparation plant is still small, so in many aspects of technology and experience are inadequate, less problems encountered, the problem can not be handled handy. In the future work, we must adhere to run more than the scene, dare to find, solve and deal with problems encountered problems, never escape, humbly to the experienced veteran workers, the old master learning; In addition, the timely organization of lessons learned, Of the problem, do not understand the problems are recorded, and seize the time to resolve the deal, do a good job in the record in order to encounter the same problem in the future, can be faster to deal with the organization. Serious study of management methods and methods to make their own production organization in the future, to better complete the leadership of the work and tasks assigned. In previous work, consider the problem is often not comprehensive, do not consider the consequences of doing things, not only delayed their own, but also affected the others, in the future work and study, must strengthen the study to make themselves more quickly mature.
Fourth, self-evaluation
In short, through a year of productive labor and technical learning, I thought and technically have been greatly improved and progress. That is, broaden the horizons, a wealth of knowledge, but also improve their management and operational level, the most important thing is for their own work in the future, to better completion of the task to lay a good foundation.
In the political and ideological aspects have also made great progress, I actively move closer to the party organization, through the cadre study, understanding of the social development of the new situation and new trends, deepened understanding and understanding of the Communist Party of China in the spirit of the 17th CPC National Congress Under the guidance of more efforts to achieve individual ideological progress and leap in the struggle more than.
Summed up the work of the past year, that there are many problems and shortcomings. In the future work, only the continuous careful summary, found deficiencies, correct shortcomings, individuals can get faster progress. I think I work well.