article 6 technical documents
6.1 party b shall, according to the delivery schedule and details stpulated in
appendix 2to the contract, deliver the documents at________________.
6.2 the date stamped by the air transportation ageney at____________,shll be taken
as the actual date of delivery paryt a shall send to party b a photostat copy of the
airconsignment note shwing the stampde date of arrival.
6.3 within twenty-four hours after the despatch of each lot of the technical documente,
party b shal1 notify party a by cable or telex of the contract number, number and date
of the air consignment note, items of the documents, number of pieces, airmail to
party a two copies of each of the air consignment note and detaikled list of the
technical documents.
6.4 if the technical documents are foumd lost, damaged or mutilated during air
trans-portation, party b shall supply party a free of charge with a second lot of
documents within thechortest possible time but not later than thirty days after it has
received from party a the writtennotice. within sixty days after party a has received
the documents from party b,if party a does not declare the shortage and request to
cover the same, it is considered asa-cepted.
6.5 the technical documents shall be in english and based on metric system of
measure-ments.
article 7 verification and acceptance
7.1 the verification test on the first samplemachine of the contracted product shall